Hi,
I'm pretty new to WatchOut and I am currently in charge of a gallery space that has a 360 wall projection that uses WatchOut. The gallery has 28 projectors and they are linked to 8 computers and 1 master computer. The specs of the computers are as attached. This system has been set up since December 2015 and lately I am having issues with the graphics cards overheating.
I have two main queries which I would like to seek the advice of the experts here:
1. Is such a set up suitable?
2. What would be the likely cause of the graphics cards overheating?
Thanks very much