Jump to content

Watchnet programmer


rogerronda

Recommended Posts

HELP!!

 

We have a project where we used 30 watchpax with projectors.

All is connected with a watchout server.

There are 4 shows that we show in a week.

Example; show 1 is on Monday,Tuesday and Thursday. The show start at 10 am and stops at 5.30 pm

On Wednesday we have 2 shows; The first show start at 10 am and stops on 3.30 pm, in the same show  the second show start at 3.40 pm and stops at 5.00 pm

On Friday, Saturday and Sunday we have 2 shows. The first show start at 10 am and stops at 5.30 pm, In the same show the second show start at 5.40 pm and stops at 6.00 pm

Now we starts the shows manual. 

I am looking for someone who can program the shows in Watchnet.

 

Is there someone who can help us with Watchnet? If possible someone from The Netherlands

 

Kind regards,

 

Roger Ronda

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...