Hi Has someone tried to make a Grass Valley Kayenne Production Switcher control Watchout?
I'm trying to figure out the best way to do it, but I want to do it over ethernet.
Inside the GVG system, there's an option to define external devices, eg. DDR, VTR etc.,
but I'm not sure if that's the way to go.
Basically I want to be able to control the AUX timelines,
meaning triggering all the preprogrammed tasks I have made for each show.
So if anyone have done this before, and want to share it, I'll be very grateful
Cheers Christian