Jump to content
Dataton Forum
Sign in to follow this  
origos

importing existing project to new one

Recommended Posts

What do you mean by "templates /watch projects/"?

 

In general, the easiest way to bring stuff over from one show to another is by copy and paste. This should work on most types of objects. Copying cues across will also bring any associated media along for the ride.

Share this post


Link to post
Share on other sites

by template i mean existing project with useful content as prepared live inputs, window animations and so on, i call it event project template.

 

 

In general, the easiest way to bring stuff over from one show to another is by copy and paste. This should work on most types of objects. Copying cues across will also bring any associated media along for the ride.

 

it means that i should be able to open two projects parallel but i can not open two instances of watchout to copy the content from one to another.

i am doing something wrong?

Share this post


Link to post
Share on other sites

Yes, you should be able to open two instanmces of the WATCHOUT producxtion software to transfer objects from one to the other. Just remember to not attempt to go online with more than one instance at a time, or wierd things may happen.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
Sign in to follow this  

×
×
  • Create New...